Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 56662 REL 9: 2010-030-00 EXP YN PROVIDE VSP ESTIMATE FOR YAKIMA STEELHEAD MPG
Project Number:
Title:
Yakima Steelhead VSP Project
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Yakima 100.00%
Contract Number:
56662 REL 9
Contract Title:
2010-030-00 EXP YN PROVIDE VSP ESTIMATE FOR YAKIMA STEELHEAD MPG
Contract Continuation:
Previous: Next:
55510: 2010-030-00 EXP YN PROVIDE VSP ESTIMATE FOR YAKIMA STEELHEAD MPG
  • 56662 REL 46: 2010-030-00 EXP YN PROJECT TO PROVIDE VSP ESTIMATE
Contract Status:
Closed
Contract Description:
This project expands RM & E activities conducted by the co-managers in the Yakima Basin (Yakama Nation and Washington Department of Fish and Wildlife) to better evaluate VSP parameters (abundance, productivity, spatial structure, and diversity) for Yakima steelhead populations.  It was developed to fill critical monitoring gaps identified in the 2009 Columbia Basin monitoring strategy review and the FCRPS Biological Opinion RPA review. This proposal builds upon the infrastructure and monitoring capacities of the YKFP umbrella M&E project (199506325).  Data from this project will be used to evaluate population status and trends, inform NOAA status reviews and implementation of the FCRPS Biological Opinion, and address critical uncertainties (e.g., the relationship between resident and anadromous life histories in the Upper Yakima and Naches populations), consistent with the NPCC Fish and Wildlife program, Columbia Basin research plan (uncertainties 3.1, 7.1 & 7.3), NOAA mid-Columbia steelhead recovery plan, and Fish Accords.  The improved understanding of steelhead population performance produced by this project will directly inform efforts to recover steelhead populations in the Yakima Basin.

Specific proposed activities include:

1.  Increased biological and DNA sampling at the Chandler juvenile, and Prosser and Roza adult monitoring facilities (Abundance, Productivity),

2.  Adult radio telemetry tagging at Prosser and Roza facilities and subsequent tracking throughout the Yakima Basin (Abundance, Productivity, Spatial Structure),

3.  Increased PIT tagging and detection throughout the Yakima Basin (Abundance, Productivity, Spatial Structure),

4.  Evaluation of flow and entrainment relationships at the Chandler (Prosser) Diversion Dam to refine steelhead smolt outmigration estimates (Abundance and Productivity),

5.  Analysis of existing and additional steelhead DNA samples to improve the genetic profile for all four populations in the MPG (Abundance, Productivity, Diversity, Spatial Structure),

6.  Expand spawner surveys and redd counts for steelhead populations (Spatial Structure),

7.  Evaluate interactions in the upper Yakima between resident rainbow and steelhead trout (Diversity, Productivity).
This project addresses reasonable and prudent alternatives (RPAs) 50 and 62 in the FCRPS biological opinion.
Account Type(s):
Expense
Contract Start Date:
10/15/2012
Contract End Date:
10/14/2013
Current Contract Value:
$290,319
Expenditures:
$290,319

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Dave Fast Yakama Confederated Tribes No Supervisor fast@yakama.com (509) 966-5291
Sandra Fife Bonneville Power Administration Yes COR safife@bpa.gov (503) 230-3678
Chris Frederiksen Yakama Confederated Tribes Yes Contract Manager chrisf@yakama.com (509) 966-5156
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Andrew Murdoch Washington Department of Fish and Wildlife (WDFW) Yes Technical Contact andrew.murdoch@dfw.wa.gov (509) 664-3148x15
Gabriel Temple Washington Department of Fish and Wildlife (WDFW) Yes Technical Contact gabriel.temple@dfw.wa.gov (509) 925-4467
Kurt Unger Bonneville Power Administration Yes Env. Compliance Lead klunger@bpa.gov (503) 230-5885
Adrienne Wilson Yakama Confederated Tribes Yes Administrative Contact Adrienne_Wilson@Yakama.com (509) 865-5121x6306


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
EC documents obtained for this contract B: 165. Provide EC documentation to BPA 10/01/2013 10/01/2013
Purchase additional telemetry equipment and Install or maintain fixed site telemetry receivers C: 70. Purchase and Install temporary fixed site radio telemetry receivers 06/28/2013 06/28/2013
500 migrating steelhead fitted with radiotags D: 158. Insert radio tags into steelhead 05/17/2013 05/17/2013
PIT-tag juvenile steelhead in tributaries of Naches E: 158. PIT-tag juvenile steelhead 10/14/2013 10/14/2013
Track tagged steelhead throughout Yakima Basin F: 157. Conduct radio telemetry study 07/31/2013 07/31/2013
Synthesize Biological data and store in local database G: 157. Collect biological data on migrating adult steelhead 10/14/2013 10/14/2013
Fulfill all administrative tasks with quality products and in a timely manner. H: 119. Manage and administer project 10/14/2013 10/14/2013
Supply WDFW with materials to construct spare antennas and replacement Instream arrays I: 70. Purchase Instream Array equipment for temporary instream PIT-tag detector 07/31/2013 07/31/2013
Annual Report for time period October 2011 through October 2012 J: 132. Annual report for prior years work elements 10/14/2013

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 2 instances of WE 70 Install Fish Monitoring Equipment
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 158 Mark/Tag Animals

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 10/15/2012
B 165 Provide EC documentation to BPA 10/15/2012
C 70 Purchase and Install temporary fixed site radio telemetry receivers 10/15/2012
D 158 Insert radio tags into steelhead 10/15/2012
E 158 PIT-tag juvenile steelhead 10/15/2012
F 157 Conduct radio telemetry study 10/15/2012
G 157 Collect biological data on migrating adult steelhead 10/15/2012
H 119 Manage and administer project 10/15/2012
I 70 Purchase Instream Array equipment for temporary instream PIT-tag detector 10/15/2012
J 132 Annual report for prior years work elements 10/15/2012